INTERNAL FINISHES OF SUBSTATION ON PROGRESS
CONTINUE EXCAVATION AND INSTALLATION OF MANHOLES
CONTINUE EXCAVATION AND INSTALLATION OF MANHOLES
CONCRETING OF COLUMNS FROM 4TH TO ROOF FLOOR
INSTALLATION OF RE-BARS AND FORMWORKS AT ROOF FLOOR
INSTALLATION OF RE-BARS, ELECTRICAL CONDUITING AND FORMWORKS FOR SUNKEN SLAB AT ROOF FLOOR
CONCRETING OF SUNKEN SLABS AND BEAMS AT ROOF FLOOR
INSTALLATION OF RE-BARS FOR COLUMNS AT LIFT MACHINE ROOM
CONTINUE INSTALLATION OF BLOCK WORKS AT 2ND FLOOR
INSTALLATION OF GRC PANEL SAMPLES AT GROUND FLOOR